Weeks 2 and 3 kind of blended together. There was a lot of electric/plumbing work going on. There wasn't anything "pretty" happening, so I was ready for this phase to be over! But it was all the really important stuff that can't be skipped, that's for sure! It seemed to drag out a bit, too, because we lost 2 days due to weather and another day b/c the lead contractor had truck trouble one day. BUT, you can see here that the header was added. Also, the wall was ready to come down-it was only the flimsy drywall between the 2 rooms at this point-I was itching so see it down!! But I realized they were keeping it up as long as possible to contain the dust, so I would have to wait a little longer. |